Site icon IRCTCPORTAL

Mega Block on 06-09-2022

Mega Block on 06-09-2020

Mega Block on 06.09.2020 (Sunday)

No Mega Block on Harbour Line

Central Railway, Mumbai Division will operate Mega Block on its suburban section for carrying out various engineering and maintenance works on 06th September 2020

Matunga-Mulund Up and Dn fast lines from 10.00 am to 3.00 pm

Dn fast special services leaving Chhatrapati Shivaji Maharaj Terminus from 9.30 am to 2.30 pm will be diverted on Dn slow line at Matunga halting as per scheduled halts and further will be re-diverted on Dn fast line at Mulund and halt as per respective scheduled halts .

Up fast special services leaving Thane from 9.28 am to 2.26 pm will be diverted on Up slow line at Mulund halting as per scheduled halts and further will be re-diverted on Up fast line at Matunga and will halt as per respective scheduled halts.

These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.

Exit mobile version