Site icon IRCTCPORTAL

Indian Railway & Union Budget Highlights

Indian Railway Budget Highlights

Last year December, the Indian Railway had announced a draft National Rail Plan. The Budget for Financial Year 2022 might include allocations and proposals to supplement this plan.

During the Budget, the government might also announce new high-speed rail corridors.

Record Outlay of Rs 1,10,055 Crore for Railways, of which Rs1,07,100 Crore for Capital Expenditure

National Rail Plan for India to create “Future Ready” Railway System by 2030

Western Dedicated Freight Corridor (DFC) and Eastern DFC expected to be commissioned by June 2022

Future DFC projects namely East Coast Corridor, East-West Corridor and North-South Corridor to be undertaken

Introduction of more vista dome LHB coaches on tourist routes

Indigenously developed automatic train protection system for high density network and highly utilized network routes

State wise Budget allocation India 2021 | State wise Budget Allocation India 2021-22

Indian Railways has received a record outlay of Rs.1,10,055 crore, of which Rs.1,07,100 crore is for capital expenditure. This record outlay was announced by the Union Minister of Finance and Corporate Affairs Smt. Nirmala Sitharaman while presenting the Union Budget 2021-22 in the Parliament today. Indian Railways have prepared a National Rail Plan for India – 2030. The Plan is to create a ‘future ready’ Railway system by 2030.

Smt. Sitharaman said, “Bringing down the logistic costs for our industry is at the core of our strategy to enable ‘Make in India’.” The Finance Minister announced that Western Dedicated Freight Corridor (DFC) and Eastern DFC are expected to be commissioned by June 2022.

Further, the Finance Minister proposed the following additional initiatives to be taken up:

  1. The Sonnagar – Gomoh Section (263.7 km) of Eastern DFC will be taken up in PPP mode in 2021-22. Gomoh-Dankuni section of 274.3 km will also be taken up in short succession.
  2. Future dedicated freight corridor projects namely East Coast corridor from Kharagpur to Vijayawada, East-West Corridor from Bhusaval to Kharagpur to Dankuni and North-South corridor from Itarsi to Vijayawada will be undertaken. Detailed Project Reports will be undertaken in the first phase.
  3. 100% electrification of Broad-Gauge routes will be completed by December, 2023. Broad Gauge Route Kilometers (RKM) electrified is expected to reach 46,000 RKM i.e., 72% by end of 2021 from 41,548 RKM on 1st Oct 2020.Passenger Convenience and Safety

Smt. Sitharaman also proposed following measures for passenger convenience and safety:

  1. Introduction of the aesthetically designed Vista Dome LHB coach on tourist routes to give a better travel experience to passengers.
  2. High density network and highly utilized network routes of Indian railways will be provided with an indigenously developed automatic train protection system that eliminates train collision due to human error.

Railways has now highest ever total Plan capex of Rs. 2,15,058 Crores this year with Rs. 7,500 Crores from internal resources, Rs. 1,00,258 Crores from extra budgetary resources and Rs. 1,07,100 Crores coming from capital expenditure allocation given in the General Budget

In BE 2020-21, the total capex was Rs. 161042 Crores. The Capex in BE 2021-22 is Rs.54,016 Crores (33%) higher than BE 2020-21

Funds allocated will go to boost Atma Nirbhar Bharat Mission and utilized towards completion of vital infrastructure projects, capacity building passengers amenities and safety enhancement

Western Dedicated Freight Corridor (DFC) and Eastern DFC expected to be commissioned by June 2022. Future DFC projects namely East Coast Corridor, East-West Corridor and North-South Corridor to be undertaken as well

Introduction of more Vista dome LHB coaches on tourist routes

Indigenously developed automatic train protection system for high density network and highly utilized networks

Indian Railways has now highest ever total Plan capex of Rs. 2,15,058 Crores this year with Rs. 7,500 Crores from internal resources, Rs. 1,00,258 Crores from extra budgetary resources and Rs. 1,07,100 Crores for capital expenditure allocation given in the General Budget.

Indian Railways received a record outlay of Rs 1,10,055crore, of which Rs 1,07,100 crore is for capital expenditure in the Union Budget 2021-22 presented in the Parliament today.

The Gross Budgetary allocation is Rs. 37,050 cr (53%) higher than BE 2020-21. Inspite of the covid, this is remarkable vindication of the progress being made being undertaken Infrastructure projects in Indian Railways.

With this increase in Capex, Indian Railways will be the driver of Indian economy. The thrust of Annual Plan 2021-22 is on infrastructure development, throughput enhancement, development of terminal facilities, augmentation of speed of trains, signaling systems, improvement of passengers/ users’ amenities, safety works of road over/under bridges etc.

The following plan heads have been allotted highest ever outlays in BE 2021-22 (Rs. in cr)

Plan head BE 2020 – 21 BE 2021 – 22 Increase over BE 2020 – 21
New Lines 26971 40932 52%
Doubling 21545 26116 21%
Traffic Facilities 2058 5263 156%
ROB/ RUBs 6204 7122 15%

National Projects of Jammu & Kashmir, Himachal Pradesh, Uttarakhand and North Eastern region have been allocated highest ever outlay of Rs 12,985 cr. in BE 21-22 against the RE 20-21 of Rs 7535 cr i.e. increase of 72%.. Rs.37,270 cr of GBS allocated for investment in PSU/ JV/ SPVs, with allocation for DFCCIL of Rs. 16,086 cr, NHSRCL of Rs. 14,000 cr and KMRCL of Rs. 900 cr.

Source wise details of BE 2021-22 compared with BE 2020-21 is shown in the following table (Rs. in cr)

Source BE 2020 – 21 BE 2021 – 22
Gross Budgetary Support 70250 107300
Internal Resources 7500 7500
Extra Budgetary Resources 83292 100258
Total Capex 161042 215058

Intense monitoring, better management and engagement with all the stake holders is ensuring that work is going on at unprecedented speed at the project sites now. Some projects will be commissioned by March 2021 are Redevelopment of Gandhinagar & Habibganj stations, Ahmedabad – Botad Gauge Conversion (170 km), Pilibhit – Shahjahanpur Gauge Conversion (83 km), Utretia – Raebarelli Doubling (66 km), Ghazipur-Aunihar Doubling (40 km), Ajmer – Bengurgram Doubling ( 47 km), and Nirmali – Sairagarh New Line including Kosi bridge (22 km). Key Railway Electrification projects that are also expected to be completed by March 2021 include: Mumbai – Abu Road, Mumbai – Ratnagiri,Howrah-New Cooch Behar section via Malda, Connectivity to Pipava Port , Ratlam/Mathura-Jaipur and Pune – Satara, Sonipat –Jind.

Last Financial year Indian Railways faced unprecedented Covid related challenges. Passenger services had to be stopped to prevent the spread of the virus. Indian Railways, however, kept the national supply chain running and moved great many number of migrants in the most adverse conditions.

The lockdown period was used as an opportunity by the Railways to complete more than 200 critical maintenance projects including massive track maintenance exercise, overhauling the freight business and fast tracking of the ongoing infrastructure projects like Dedicated Freight Corridors, J&K and North-East connectivity etc. In the post lockdown phase, remarkable revival in IR’s freight loading has been observed especially in the last 5 months, which shows the economic revival in the country as well as modal shift to Railways. This is due to doubling of average speed of freight trains from 23 kmph to 46 kmph, various tariff and non-tariff measures, as well as a first time ever “Freight Business Development Portal” for online booking of freight. The year is likely to close with higher loading over last year.

It may be noted that Indian Railways has prepared a National Rail Plan (NRP) for India-2030. This will be for a future ready Railways, wherein infrastructure will be created by 2030, which shall be able to cater to the demand till 2050. NRP which identifies demand and required capacity augmentation needed till 2030 also lays focus on retrieving the modal share for IR to the level of 45% by 2050 with ultimate aim to reduce logistic cost of the economy.

In the budget, it was announced that Western Dedicated Freight Corridor (DFC) and Eastern DFC are expected to be commissioned by June 2022. Further, the Finance Minister proposed the following additional initiatives to be taken up:

1. The Sonnagar – Gomoh Section (263.7 km) of Eastern DFC will be taken up in PPP mode in 2021-22. Gomoh-Dankuni section of 274.3 km will also be taken up in short succession.

2. Future dedicated freight corridor projects namely East Coast corridor from Kharagpur to Vijayawada, East-West Corridor from Bhusaval to Kharagpur to Dankuni and North-South corridor from Itarsi to Vijayawada will be undertaken. Detailed Project Reports will be undertaken in the first phase.

3. 100% electrification of Broad-Gauge routes will be completed by December, 2023. Broad Gauge Route Kilometers (RKM) electrified is expected to reach 46,000 RKM i.e., 72% by end of 2021 from 41,548 RKM on 1st Oct 2020.

While Focusing on Passenger Convenience and Safety, the budget has also proposed Introduction of the aesthetically designed Vista Dome LHB coach on tourist routes to give a better travel experience to passengers and provision of indigenously developed automatic train protection on High density network and highly utilized network routes of Indian railways. This system minimized the possibility of train collision due to human error.

What Is National Rail Plan 2030?

National Rail Plan 2030 PDF Download – Click Here

Pink Book pdf Download | Indian Railway Pink Book pdf Download

No. Pink Book For More Information
1 Central Railway (CR) Pink Book Click Here
2 East Central Railway (ECR) Pink Book Click Here
3 Banaras Locomotive Works (BLW) Pink Book Click Here
4 Eastern Railway (ER) Pink Book Click Here
5 East Coast Railway (ECoR) Pink Book Click Here
6 Integral Coach Factory (ICF) Pink Book Click Here
7 Northern Railway (NR) Pink Book Click Here
8 North Central Railway (NCR) Pink Book Click Here
9 Rail Wheel Factory (RWF) Pink Book Click Here
10 North Eastern Railway (NER) Pink Book Click Here
11 North Western Railway (NWR) Pink Book Click Here
12 Diesel Loco Modernisation Works Pink Book Click Here
13 Northeast Frontier Railway (NFR) Pink Book Click Here
14 South East Central Railway (SER) Pink Book Click Here
15 Modern Coach Factory Rae Bareilly (MCF) Pink Book Click Here
16 Southern Railway (SR) Pink Book Click Here
17 South Western Railway (SWR) Pink Book Click Here
18 Railway Electrification Pink Book Click Here
19 South Central Railway (SCR) Pink Book Click Here
20 West Central Railway (WCR) Pink Book Click Here
21 Research, Design and Standards Organisation (RDSO) Pink Book Click Here
22 South Eastern Railway (SER) Pink Book Click Here
23 Metro Railway (MR) Pink Book Click Here
24 Metropolitan Transport Project, Chennai (MTPC) Pink Book Click Here
25 Western Railway (WR) Pink Book Click Here
26 Chittaranjan Locomotive Works (CLW) Pink Book Click Here
27 Railway Board (RB) Pink Book Click Here
28 Rail Coach Factory Kapurthala (RCFK) Pink Book Click Here
29 Rail Wheel Plant, Bela (RWP) Pink Book Click Here
Exit mobile version